- Walnut Creek Pediatric Intensive Care Unit – Installed and terminated complete infrastructure for voice, data, WAP, Cable TV, 7 EICU.
- Endoscopy - Installed and terminated infrastructure at Walnut Creek Campus.
- WC Phase 4 Data Center – Installed and terminated all Fiber to connect the new Data Center with the existing WC Data Center.
- Emergency Department – Installed and terminated complete infrastructure for WC ER.
- New IDF Closets – Design-build new IDFs at WC 4 EAST wing to support complete Phase 1 Tower and 2.1.1 to support complete Phase 2 Tower.
- Concord Campus – Installed and terminated complete infrastructure for voice, data, WAP, Cable TV, 7 EICU at 2700 Grant Ave.
- Nuclear Medicine – Demo, installed and terminated complete infrastructure for voice, data, WAP, for Nuclear Medicine at Concord Campus.
- Behavioral Health – Design-build IDF and installed complete Wireless, Data, Voice, and Security Infrastructure at Concord Campus.
- Pediatrics – Installed and terminated complete infrastructure for Voice, Data, WAP, at Brentwood Campus.
- Urgent Care – Demo, installed and terminated complete infrastructure for Voice, Data, WAP, for Urgent Care at Brentwood Campus.
- Corporate Center – Design-build new Fiber and switch upgrade at 1400 Treat Blvd. Design-build new fiber channel upgrade at Corporate Center.
City of Pittsburg